Pages

Thursday, April 5, 2012

Day two of building the Tree house

All the 4x4x16 foot posts are set in three feet of cement and the bottom perimeter is bolted to the frame. We now have a very strong foundation for the tree house on stilts.
Before one of the poles could be set, this very large root had to be removed.  These two men divided and concored.  The Chief tackled the root and The Cisco Kid tackled some dirt.  

PhotobucketPhotobucket

No comments:

Post a Comment