Pages

Sunday, April 8, 2012

The Tree House is 99% DONE!!!

Yes....This tree house has been eight days in the making.  We took a break on Thrusday and went to the Kennidy Space Center. ( I will post about that tomorrow).  On Friday we were back in action.  The only thing we have left to do is the Zip Line. 

The Cisco Kid told me he wanted a crane for the top of his tree house. We went to Lowes and I brought him to the section where they sell PVC pipe. I told him we could make the crane out of PVC. That was all it took. As soon as he saw all the different shapes and sizes of pipes, he was in design mode. I gave him one small pointer about how one larger pipe can fit on tip of a smaller pipe so the crane would move. He found the angle he wanted and he knew he wanted the arm to extend going up. At one point he grabbed a couple of people that worked there and asked where he could find a cap for the crane and the pulley. The people spoke to him with such regard and respect. I was amazed. 
The stair case leading to the top deck.  
 
The view from the top of the Tree House.  
The zip line might be done next weekend. I will post about it then. 




PhotobucketPhotobucket

1 comment: